Dam Construction

Longford-Flood-Protection-Levy-460x240

Duckhole Rivulet Dam Construction

Year: 2012
Value: $1.8M

The Duckhole Rivulet Dam project involved construction of an embankment, spillway crest and chute, bypass channels and outlet works, including pipelines and valves, access roads, electrical and

Lake-Binney-460x240

Lake Binney Dam Wall Modification

Year: 2011
Value: $5.3M

This major earthworks project removed the downstream buttress and replaced the existing dam filters, raised the clay core and reconstructed Brady’s Lake Road. Project Profile – Lake.

Duckhole-Dam-460x240

Longford Flood Protection Levy – Earthworks and Drainage

Year: 2006
Value: $2.5M

Clay flood protection levy walls were constructed (nominally 181,640 cubic metres) including drainage access through the levy wall. Significant testing was carried out on the levy wall.

Henty-Gold-Mine-460x240

Henty Gold Mine Tailings Dam

Year: 2001
Value: $1.3M

A compacted earth/clay tailings dam was constructed, including stripping, foundation preparation, embankment construction, decant tower and spillway. Project Profile – Henty Gold Mine

Hydro-Canal-Sweep-460x240

Hydro Canal Sweeps

Year: 2002-2013
Value: $253K

AWC have provided canal sweeping of Tarraleah No. 1 Canal from Butlers Gorge Power Station. Project Profile – Hydro Canal Sweep.

 Nyrstar Zinifex Hobart Smelter2

Nyrstar Hobart Smelter

Year: 2007
Value: $1.4M

Construction of a stormwater retention pond and bio reactors including pump station and rising main.