Retaining Walls / Structures


Hutchins School Retaining Wall

Year: 2011
Value: $81K

A mass block retaining wall was constructed, using a 14 tonne excavator and eight tonne trucks to remove site fill and install blocks. Click here for Project


West Tamar Highway – South of Beaconsfield

Year: 2010
Value: $2.2M

The West Tamar Highway required road realignment at Flower Gully Road junction, as well as construction of a large box culvert while maintaining two lanes of traffic


Duckhole Rivulet Dam Construction

Year: 2012
Value: $1.8M

The Duckhole Rivulet Dam project involved construction of an embankment, spillway crest and chute, bypass channels and outlet works, including pipelines and valves, access roads, electrical and


Murdunna Highway Retaining Wall

Year: 2014