Kingborough Twin Oval

The Project
Design and construct two sand based ovals including automatic irrigation and drainage, lighting, access road, carpark and services for future facilities.

Location: Kingston, Tasmania

Contract Value: $4.5m

Construction Period: November 2009 - November 2010

Stakeholder Engagement:

  • Kingborough Municipal Council
  • Local residents

Project Managers: Warren Clark / Craig Fazackerley

Project Foreman: Tim Walter

Scope of Works
A design and construct project in conjunction with Ross Cumming, Engineer.
AWC and their sub contract turf specialist, Total Turf Care, and PSG Russell Smith who provided lighting design and installation, undertook the construction of the two ovals, car park, practice wickets and the recycled water system.  A total of 17,000 tonnes of sand was placed on the two ovals.