Kingborough Twin Ovals

The Project
Design and construct two sand-based ovals including automatic irrigation and drainage, lighting, access road, carpark and services for future facilities.

Location: Kingston, Tasmania

Contract Value: $4.5m

Construction Period: November 2009 - November 2010

Project Managers: Warren Clark / Craig Fazackerley

Project Foreman: Tim Walter

Scope of Works
This was a design-and-construct project in conjunction with engineer Ross Cumming. AWC undertook the project with sub-contracted turf specialist Total Turf Care and PSG Russell Smith which provided lighting design and installation.

The project included construction of  two ovals, car park and practice wickets and a the recycled water system.  A total of 17,000 tonnes of sand was placed on the two ovals.